MTA Bus Time

TIP: Enter an intersection, bus route or bus stop code.

Bus Stop:

21 ST/41 AV

Buses en-route:

B62  ASTORIA

  1. 11 minutes,1.7 miles away Vehicle 7211
  1. 11 minutes,1.7 miles away, ~10 passengers on vehicle Vehicle 7254
  1. 32 minutes,3.9 miles away Vehicle 7833

Q66  FLUSHING via NORTHERN BL

  1. 14 minutes,0.6 miles away (at terminal, scheduled to depart at 11:10 AM) Vehicle 622
  1. 34 minutes,0.6 miles away (at terminal, scheduled to depart at 11:30 AM) Vehicle 602
  1. 54 minutes,3.7 miles away (+ layover, scheduled to depart terminal at 11:50 AM) Vehicle 625

Q69  EAST ELMHURST via 21 ST via DITMARS BL

  1. 4 minutes,0.6 miles away (at terminal) Vehicle 9213
  1. 10 minutes,1.6 miles away (+ layover, scheduled to depart terminal at 11:05 AM) Vehicle 7458
  1. 19 minutes,1.6 miles away (+ layover, scheduled to depart terminal at 11:15 AM) Vehicle 9224

Q100  LIMITED RIKERS ISLAND

  1. 34 minutes,2.7 miles away (+ layover, scheduled to depart terminal at 11:30 AM) Vehicle 9190

Q103  ASTORIA

  1. 4 minutes,0.6 miles away Vehicle 7459
  1. 33 minutes,2.0 miles away (+ layover, scheduled to depart terminal at 11:20 AM) Vehicle 7467

Service Alert:

  • The Flushing-bound Q66 stop at 21st St/41st Ave will be closed.Use a temporary stop at 21st St/40th Ave instead.

    What's Happening?

    Construction

  • The Rikers Island-bound Q66 stop at 21st St/41st Ave will be closed.Use a temporary stop at 21st St/40th Ave instead.

    What's Happening?

    Construction

  • Northbound B62 buses are detoured due to construction at Park Ave between Hall St and Classon Ave.

    While detoured, northbound B62 buses will not make stops from Park Ave/Washington Ave to Classon Ave/Park Ave.

    While detoured, stops will be made along Flushing Ave as requested.

    Note: Bus arrival information may not be available/accurate while buses are detoured.

  • The East Elmhurst-bound ‌Q69 stop at 21st St/41st Ave will be closed.Use a temporary stop at 21st St/40th Ave instead.

    What's Happening?

    Construction

Refresh (Updated 11:00:05 AM)